Self-propelled scissor aerial work platform
Four-wheeled mobile lifting platform
Fixed scissor lift platform
Heavy-duty fixed scissor lift platform
Fixed rail type lifting platform
Aluminum alloy type lifting platform
Self-folding arm type lifting platform
Home Lifting Machine
Vehicle-mounted lifting platformAerial work vehicle
Copyright © Shandong Jiyang Machinery Factory Co., Ltd. 鲁ICP备11029516号-3 www.300.cn
PRODUCTS
Tel: 0531-84211935 0531-84222430 / Mobile: 18560027566
Fax: 0531-84211081
E-mail: sdjyjxc@126.com
Address:No.1, Hydraulic Lifting Platform Industrial Park, Jiyang District, Jinan City, Shandong Province, China (west of G220 line at the residence of Huihe Town)
CONTACT US
ABOUT US
NEWS
JIYANG MACHINERY FACTORY
导轨式升降机:导轨式升降机如何安装
导轨式升降机如何安装
导轨式升降机安装不是一项简单的任务,一般由持有安装证书的公司指派人员操作。
导轨的制作一般为H型钢或方管,运至现场后焊接安装。由于导轨柱长度较长,安装非常麻烦,需要使用卷扬机等物品进行吊装。如果室外安装也可以用吊车进行,就比较简单了。设备必须固定在厂房的主梁结构中,必须由专业人员固定,小导轨式升降机。固定时,必须测量设备和孔之间的距离。
以下小编将详细解释安装步骤
首先,将台面放在坑的中心,测量上下开口的垂直度。此时,考虑二楼或三楼地板与设备之间的间隙。充分测量后,稍微固定一下升降台面,防止安装导轨移位。
架设导轨时,注意导轨的垂直度。首先在左右两侧各立一根导轨,与坑内预埋件焊接牢固。接下来,将设备提升架安装到位,然后安装另外两个导轨。四个导轨用预埋件固定后,下一步是安装油缸。如果是八个导轨,原理是一样的。
安装油缸前还要注意一点:将油缸底座安装在导轨式升降机导轨中间,测量好。切割两片钢,用导轨式升降机导轨焊接,焊接在油缸底座上部,无具体尺寸。首先,将耳环安装在油缸上的适当位置。(这时,链条也可以安装到位。如果不方便,可以在下一步安装。)用手拉下链条,提起提升架,直到油缸能放在油缸底座上。此时,松开链条并安装链条。
首先计算链条的长度,在油缸总长度上加1-1.5米。根据实际情况,链条的一端安装在链条固定梁上,链条固定梁通过升降架的链轮安装在工作台的链条套上。下一步是焊接链条固定梁,测量链条与导轨式升降机导轨的距离,找好位置,使链条尽可能垂直,不弯曲。
上述步骤完成后,开始连接油管、电机线、配电柜和上控制开关。接线完成后,可以对机器进行测试。